The construction crew has been hard at work on the garage to one bedroom transformation at Kipling Street. The drywall is in place and the mudding process is under way. Painting should begin at the end of the week. 

Entry way with a view down the hallway. The doorway to the left leads to the bedroom and the door at the end of the hallway gives access to the bathroom. 

Living room have plenty of room to relax and unwind for short term rental guests. 

This is a view of the progress on the kitchen with access to what will be the laundry room. 

This space is planned to be the dining area.

A fresh coat of paint was applied to the exterior and siding was added around the windows that were placed where the garage doors. 

Another window was added in the kitchen, which helps to brighten up the space indoors and provides views of the beautiful trees and flowering bushes in the yard around the unit.